The quarries bridge

Seismic design including non-linear dynamic design for the two quarry bridges between Afula and Nazareth (Route 60) with a total length of 410 m.

The bridge was designed by the Kadmor Engineers company and executed by Solel Bona for Maatz (National Roads Company of Israel) The design was successfully audited by ATI (a world-renowned engineering company from California).