Weizmann Institute performance hall

Deep renovation and earthquake upgrade of an existing theater and assembly building, including opening openings in ceilings and walls, removing structural columns, opening and closing facades as permitted (conservation structure), adding an elevator, strengthening roofs for added weight of equipment, cladding walls, steel construction roof, strengthening tribunes Using steel beams for protection from vibrations (increasing the frequency), reinforcement with FRP sheets.